Pore filling

Medium area performance: 150 m2/h

Filling pores in porous floor coverings such as worn out linoleum, porous stone floor coverings, or cement floors

Use on absorbent floor coverings if necessary as a basis for protective treatment.

Preparatory work (Pore filling)

Remove any loose dirt.
Dusting
Dry/brush vacuum cleaning

Put up the warning sign.

Carry out basic cleaning first if necessary.
Wet scrubbing
Wet vacuuming

Main work involved (Pore filling)

Pore undiluted pore filler onto the floor and apply evenly with an application tool and cover, making overlapping circular movements.
Apply 1 thin coat: do not allow the pore filler to form a layer on the surface. Do not apply too thickly! Work in strips.
Always work wet-on-wet to ensure a smooth transition. Work rapidly and carefully, taking care not too rush things: then let the pore filler be absorbed. Note the drying time! 
Do not walk on surface until dry.

Final steps (Pore filling)

Clean the tool and cleaning materials.
Then apply protective treatment if necessary: coating, waxing, or oiling methods.  

Suitable products